Engineering, Procurement and Construction (EPC) for CGEC 15/18.75 MVA Substation and 69 KV Connection Point Switchyard

Engineering, Procurement, Construction, Test and Commissioning of 69kV Transmission Line with Optical Ground Wire (OPGW) and Line Disconnect Switch at the Connection Point

Supply, Delivery, Installation, Test and Commissioning of Power Transformer

Locations: Orani, Bataan

Scope: Design, Supply, Delivery, Construction, Testing and Commissioning of Sub Transmission Line and 15 MVA Substation and Switchyard

Project Cost: PhP 82 Million