VS Gripal Power Corporation

Engineering, Procurement and Construction (EPC) for VSGPC 10/12.5 MVA Substation and 69 KV Connection Point Switchyard Supply, Delivery, Installation, Test and Commissioning of Power Transformer Locations: San Jose City, Nueva Ecija Scope: Design, Supply, Delivery, Construction, Testing and Commissioning of and 10 MVA Substation and Switchyard. Project Cost: PhP 42.6 Million

Grass Gold Renewable Energy Corp.

Engineering, Procurement, Construction, Test and Commissioning of 69kV Transmission Line with Optical Ground Wire (OPGW) and Line Disconnect Switch at the Connection Point  Switchyard Supply, Delivery, Installation, Test and Commissioning of Power Transformer Locations: Llanera, Nueva Ecija Scope: Design, Supply, Delivery, Construction, Testing and Commissioning of Sub Transmission Line and 15 MVA Substation and Switchyard …

Grass Gold Renewable Energy Corp. Read More »

CleanGreen Energy Corporation

Engineering, Procurement and Construction (EPC) for CGEC 15/18.75 MVA Substation and 69 KV Connection Point Switchyard Engineering, Procurement, Construction, Test and Commissioning of 69kV Transmission Line with Optical Ground Wire (OPGW) and Line Disconnect Switch at the Connection Point Supply, Delivery, Installation, Test and Commissioning of Power Transformer Locations: Orani, Bataan Scope: Design, Supply, Delivery, …

CleanGreen Energy Corporation Read More »

Nueva Vizcaya Electric Cooperative, Inc. (NUVELCO)

Supply, Delivery, Installation Construction, Testing and Commissioning  of 10MVA Power Substation and Construction of 69kV Transmission Line and 13.2kV Triple Circuit Distribution Line Locations: Gabut, Dupax Del Sur, Nueva Vizcaya Scope: Design, Supply, Delivery, Construction, Testing and Commissioning of Sub Transmission Line, Distribution Line and 10 MVA Substation Project Cost: PhP 62 Million

Pampanga III Electric Cooperative, inc. (PELCO III)

Supply, Delivery, Installation, & Testing and Commissioning of 3.1 kM, 69 kV, 3-Phase Sub-Transmission Line from Macabebe Substation to Masantol Proposed Substation Locations: Masantol, Pampanga Scope: Design, Supply, Delivery, Construction Testing and Commissioning of 3.1kms. Sub Transmission Line and 25 MVA Substation Project Cost: PhP 62 Million

Guimaras Electric Cooperative, inc. (GUIMELCO)

Supply, Installation/ Construction, Testing and Commissioning of 69KV Protection Equipment Switchyard and 10/12.5MVA Substation with four (4) feeders, 13.2KV double circuit (underbuilt) line Locations: From Zaldivar, Buenavista to San Miguel, Jordan, Guimaras Scope: Design, Supply, Delivery, Construction, Testing and Commissioning of Sub Transmission Line, Distribution Line, Switchyard and 10 MVA Substation Project Cost: PhP 112 …

Guimaras Electric Cooperative, inc. (GUIMELCO) Read More »

Scroll to Top